Clarke DEVIL 4100 Spécifications Page 7

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 6
7
Parts & Service: 020 8988 7400/E-mail:[email protected] or [email protected]
CLEANING & MAINTENANCE
ALWAYS allow the heater to cool down for at least 15 minutes and disconnect
it from the mains supply before performing any maintenance tasks.
PERIODICALLY
1. Inspect the mains cable for damage. Undue heat will cause the cable to
stiffen and crack. If this is found, have the cable replaced. Check cable
routing and ensure it is well away from the heat source.
2. Should the heater become dirty, disconnect from the mains supply,
remove the guard and wipe the reflector and elements with a clean
damp cloth. DO NOT use abrasive cleaners. Take care that no moisture
enters the heater.
Refer to your CLARKE dealer if internal maintenance is required.
When storing the heater, allow it to cool down, then place it for storage in
a dry, ventilated place.
HEAT ELEMENT REPLACEMENT
Ceramic heat elements are long lasting and should not need replacing under
normal circumstances. Should this become necessary take the heater to your
Clarke dealer.
Vue de la page 6
1 2 3 4 5 6 7 8 9 10 11 12

Commentaires sur ces manuels

Pas de commentaire